In response to the expanding business process outsourcing industry, CEAC Outsourcing began construction of a purpose-built facility in 2018. 

The 60,000 sq. ft. building is being designed to use modern energy efficient features to reduce operating costs, impact of natural hazards and adverse environmental impact.

The features of this facility include:

  • 60,000 sq. Ft of rentable area
  • Strategic placement along the Mandella Highway at the gateway of Kingston in a special economic zone, approximately halfway between Kingston & Portmore (the largest dormitory community in the Caribbean)
  • Approximately 1 acre of land space
  • Foundation elevated 3m above surrounding land
  • Recreation area
  • Over 50 on-site parking spaces (3 disabled)
  • Fire protection & life safety including addressable fire alarm & detection system, extinguishers and hose reels
  • Emergency lighting & exit signs
  • 3 days of water storage (25,600 gallons) with individual sub meters for each floor
  • Modern energy efficient features to reduce operating costs, impact of natural hazards and adverse environmental impact.

CEAC Outsourcing acts as the construction management team to this project as well as the property owner.
Ferry BPO 31 is expected to be completed by February 2020

More Projects

Collection and Disposal of Used Street Lights and Hazardous Waste (2022 – 2023)

CEAC Outsourcing Company Limited and HazPro provided waste management services to the Government of the Commonwealth of the Bahamas and Bahamas Power and Light Company Ltd. (BPL) by the safe, efficient and timely collection, storage, processing, […]

J Wray & Nephew (2017 – Present)

In 2017 J Wray & Nephew contracted CEAC Outsourcing to manage their waste water treatment plant (WWTP) located on Spanish Town road, Kingston. Services to JWN include: Operations & Maintenance of WWTP Record keeping of operations […]

Campari (2018 – 2019)

As a byproduct of Campari’s manufacturing process, sludge is generated and occasionally requires specific treatment, in this case, incineration. CEAC Outsourcing undertook the role of waste management in the disposal of 60,000 kgs of hazardous waste […]

  • This field is for validation purposes and should be left unchanged.