As a byproduct of Campari’s manufacturing process, sludge is generated and occasionally requires specific treatment, in this case, incineration. CEAC Outsourcing undertook the role of waste management in the disposal of 60,000 kgs of hazardous waste sludge.

The role of CEAC included:

  • Collection and transportation of waste
  • Documentation & record keeping of chain of custody
  • Incineration
  • Emissions monitoring and analysis to maintain environmental compliance
  • Reporting to the National Environment and Planning Agency
  • Ash storage
  • Ash disposal
  • Provision of “certificate of completion” I.e Evidence of environmentally compliant waste management/ disposal/ treatment

More Projects

Campari (2018 – 2019)

As a byproduct of Campari’s manufacturing process, sludge is generated and occasionally requires specific treatment, in this case, incineration. CEAC Outsourcing undertook the role of waste management in the disposal of 60,000 kgs of hazardous waste […]

Ferry BPO (2017 – Present)

In response to the expanding business process outsourcing industry, CEAC Outsourcing began construction of a purpose-built facility in 2018.  The 60,000 sq. ft. building is being designed to use modern energy efficient features to reduce operating […]

Jamaica North South Highway (2015 – 2022)

In 2015 CEAC Outsourcing was contracted by the Jamaica North South Highway company to provide staffing solutions for the operation and maintenance of the Highway.  To date, we manage approximately 60% of the staff between Caymanas […]

  • This field is for validation purposes and should be left unchanged.